Beaver St. Interceptor Rehabilitation/Replacement and New Beaver St. Pump Station

Start / End Dates & Times: 
12/20/2022 - 8:45am to 03/08/2023 - 11:00am
Bid: Closed
Status: 
Pending

Under MGL c. 30-39m, the Town of Franklin seeks bids for the Beaver Street Interceptor Rehabilitation/Replacement Project and New Beaver Street Pump Station.  Pre-bid conference and site walk through on 1/12/2023 at 11:00 AM at the Franklin Municipal Building.

The project includes but is not limited to: - Installation of approximately 8,000 lf of 8" to 24" sanitary sewer using open-cut excavation and/or jack and bore; - Rehabilitation of approximately 6,000 lf of 16" to 24" sanitary sewer using cured-in-place pipe lining; - Installation of approximately 4,000 lf of 18" sanitary sewer force main by open-cut excavation and construction of associated sanitary sewer pump station; - Installation of approximately 900 lf of new water main; - Associated work including new manholes, manhole rehab., trench and roadway pavement, traffic controls, and utility abandonment and relocation. 

Additional Information:  Beaver Street Interceptor Rehabilitation/Replacement and New Beaver Street Pump Station 

Subscribe to Updates

The form below must be filled out, as this will ensure you automatically receive any associated addendums. Once completed, you will then be able to view the Bid/RFP.

Business Information

By clicking submit, you are acknowledging that you will receive an email notification with a link back to the website whenever an addendum is posted to this bid.